This entity is experimental and might be changed or removed in a future release.

Start drawing the path from this offset in the path data.

Path offsets are measured in a normalized 0..1 range. PathStart must be in the range 0..1.

Location

Namespace
Fuse.Controls
Package
Fuse.Controls.Primitives 2.9.1

Returns

float